Changing an account on an existing supply is very different from installing a new connection. These examples help you plan; your supplier must confirm your own date.
Broadband & connectivity
Fibre terminal already installed
BT Business gives an indicative 1–3 working days for remote activation where a suitable optical network terminal is already in place. Your provider must confirm availability and the start date.
Straightforward fibre installation
BT Business gives 9–18 working days for a one-stage installation, depending on engineer availability. External construction or permissions can extend the timetable.
Dedicated leased line
Allow much more planning time. BT says a new BTnet service can take up to 70 working days, depending on the survey. Use the supplier’s site-specific estimate rather than treating this as a guaranteed deadline.
Electricity
Switching an existing supply
EDF says a business energy switch typically takes five working days unless a later start date is agreed. Existing contract restrictions or an objection can affect a switch. Get the actual transfer date confirmed.
Moving into an office
Record the meter reading and date when your responsibility starts, and contact the existing supplier promptly to establish the account. A change of occupier and a supplier switch are separate steps.
A new physical connection
A supplier switch does not install a meter or create a new electricity connection. If supply infrastructure is missing or needs upgrading, obtain a separate works timetable before relying on a move-in date.
Office cleaning
Starting a regular service
Ask the provider to confirm a start date after reviewing the specification, staffing and building access. There is no reliable universal setup time for every office.
Before the first visit
Agree keys or passes, alarm instructions, permitted working hours and the areas to avoid. Schedule any initial deep clean separately from the regular service.
Choosing frequency
Base the schedule on occupancy and how heavily kitchens and washrooms are used. A hybrid office may need a different pattern from an office occupied five days a week.
Water & wastewater
An existing working supply
If the premises already have a supply, you generally need the correct account rather than a new physical connection. Notify the retailer of your occupation details promptly.
Changing retailer
Ask the retailer to confirm eligibility and the transfer date for your premises. Switching rules differ across the UK; do not assume every business can switch in the same way.
A new physical connection
New water or wastewater infrastructure is a separate process involving the relevant network provider. Obtain a site-specific quote and works timetable; an account-opening estimate does not cover construction.
Waste & recycling
Setting up regular collections
Confirm the first collection date as well as sack or bin delivery. Receiving supplies does not mean a collection is booked for the same day.
A supplier delivery example
First Mile’s paper-recycling page gives 1–3 working days for sack delivery, with collections starting on the selected schedule. This is a product-specific example; confirm timing for your postcode and chosen service.
Before collections begin
Agree where waste will be stored and presented, the collection times and any building restrictions. Make sure staff know which materials belong in each stream.
Work backwards from your first working day.
- Check services and equipment already available in your exact floor or unit.
- Ask for any survey and landlord permissions before committing to an installation date.
- Agree building access, engineer appointments and a named contact.
- Allow time to test Wi-Fi, equipment and access arrangements before the team arrives.
- If the date is tight, ask about temporary connectivity and check mobile coverage indoors.