ONTO

SERVICE GUIDE

Electricity.
A clearer starting point.

Understand your meter, compare the whole bill and arrange the right contract for your premises.

How much should I be paying?

There is no single fair price for every office. Compare quotes using the same annual consumption, start date and contract length. A fixed unit rate does not mean a fixed monthly bill.

  • Multiply annual usage in kWh by the quoted unit rate, then add the daily standing charge for the year.
  • For a meter with day, night or other rates, calculate each usage band separately.
  • Check VAT, applicable levies and any additional or variable charges before comparing totals.
  • Ask how any broker fees or commission are included, and which suppliers the comparison covers.
  • Check the contract end date, renewal terms and any restrictions on leaving your existing contract.

Work out the cost with your own figures

How long does it take?

Switching an existing supply

EDF says a business energy switch typically takes five working days unless a later start date is agreed. Existing contract restrictions or an objection can affect a switch. Get the actual transfer date confirmed.

Moving into an office

Record the meter reading and date when your responsibility starts, and contact the existing supplier promptly to establish the account. A change of occupier and a supplier switch are separate steps.

A new physical connection

A supplier switch does not install a meter or create a new electricity connection. If supply infrastructure is missing or needs upgrading, obtain a separate works timetable before relying on a move-in date.

What should I have ready?

  • The premises address and the date your responsibility for electricity begins.
  • The electricity supply number (MPAN), meter serial number and meter type, if available.
  • A recent bill or annual consumption in kWh, including separate usage bands where relevant.
  • Current contract details if you are renewing or switching.
  • A dated opening meter reading and photograph where it is safe to obtain them.

Check what’s already included.

Check whether your office has its own supplier account or whether electricity is purchased centrally and recharged by the landlord. Confirm which meter serves your space before requesting a contract.

Use the landlord checklist
Sources and review date

Reviewed 22 November 2026. Supplier examples explain possible timings; they are not ONTO quotes or evidence of a supplier partnership.

Let’s get it sorted.

Start your office plan in ONTO, or tell us what you need help arranging.

Supplier availability, prices and start dates need confirmation before you commit. Sample options in the platform are clearly marked.