How much should I be paying?
Compare the full contract cost, not just the introductory monthly price. Availability and installation costs depend on your exact address.
- Published example, checked 22 November 2026: Zen Full Fibre 100 starts at £30/month excluding VAT on an 18-month contract (100 Mbps estimated download, 18 Mbps upload). Full Fibre 300 starts at £34/month excluding VAT. Address availability applies; these are supplier examples, not ONTO offers or market averages.
- Add installation, equipment and any known price increases to the monthly charges across the contract.
- Compare upload speed and minimum guaranteed speed as well as the advertised download speed.
- Check the support hours, fault response and whether a backup connection costs extra.
- Confirm whether Wi-Fi access points and coverage throughout your office are included.
- Check the contract length, cancellation terms and whether each price includes VAT.
How long does it take?
Fibre terminal already installed
BT Business gives an indicative 1–3 working days for remote activation where a suitable optical network terminal is already in place. Your provider must confirm availability and the start date.
Straightforward fibre installation
BT Business gives 9–18 working days for a one-stage installation, depending on engineer availability. External construction or permissions can extend the timetable.
Dedicated leased line
Allow much more planning time. BT says a new BTnet service can take up to 70 working days, depending on the survey. Use the supplier’s site-specific estimate rather than treating this as a guaranteed deadline.
What should I have ready?
- The full installation address, floor and suite, not just the building postcode.
- Your target start date and the earliest date an engineer can access the office.
- Team size, video-call use, large file transfers and any critical applications.
- Details or photographs of any existing fibre terminal and communications cabinet.
- A building contact who can confirm access, cable routes and any permissions required.
Check what’s already included.
Ask whether the building provides internet or only the cabling infrastructure. A fibre-enabled building does not by itself confirm an active service to your floor or Wi-Fi throughout your office.
Use the landlord checklistSources and review date
Reviewed 22 November 2026. Supplier examples explain possible timings; they are not ONTO quotes or evidence of a supplier partnership.