How much should I be paying?
Look beyond the water unit rate. Depending on the property and tariff, the bill can include water, wastewater, standing charges and drainage. A national price per office would hide these differences.
- Compare the water and wastewater charges together, using the same expected consumption.
- Include standing charges and any drainage charges shown on the bill.
- Check whether readings are actual or estimated before judging a change in cost.
- Check the meter size and the premises covered by the account if fixed charges seem unexpected.
- Confirm contract terms, any fees and VAT treatment rather than comparing a saving percentage alone.
How long does it take?
An existing working supply
If the premises already have a supply, you generally need the correct account rather than a new physical connection. Notify the retailer of your occupation details promptly.
Changing retailer
Ask the retailer to confirm eligibility and the transfer date for your premises. Switching rules differ across the UK; do not assume every business can switch in the same way.
A new physical connection
New water or wastewater infrastructure is a separate process involving the relevant network provider. Obtain a site-specific quote and works timetable; an account-opening estimate does not cover construction.
What should I have ready?
- The premises address, floor and the date you take responsibility.
- An existing bill or the current retailer’s details, if available.
- The Supply Point Identifier (SPID) for water and wastewater, where available.
- The meter location, serial number and opening reading if safely accessible.
- Confirmation of whether the landlord bills you directly for water.
Check what’s already included.
Ask whether water is included in the service charge, recharged separately or billed directly by a retailer. In a shared building, confirm whether the meter measures your space or the whole property.
Use the landlord checklistSources and review date
Reviewed 22 November 2026. Supplier examples explain possible timings; they are not ONTO quotes or evidence of a supplier partnership.